By Sachin Sharma, GM-Marketing, Richa Industries Limited Pre Engineered Buildings have shown tremendous success by their use in variety of applications. From simple box like buildings to complicated high-rise structures, PEB has astonished everyone with impressive upshot. These buildings are flexible and can be easily moulded as per the environment conditions. PEB is best suited […]

Pre Engineered Building System Shining in New Era Change is inevitable. Nowadays, everybody is scared of rapidly changing environment conditions. The Government is taking various initiatives to maintain the balance of environment which has been otherwise disturbed due to unhealthy practices. However, the alteration in traditional practices have become earnest need to face such challenging […]

  Richa Industries Limited, a leading Construction & Engineering company has secured first order to construct rail over bridge for Indian Railways.The project involves construction of approximately 100-110 meter span rail over bridge within the estimated completion time of fifteen months from the date of LOI. The Project value is approximately INR 20 Crores. http://www.richa.in

Pre Engineered Buildings are emerging as perfect alternative to RCC and taking construction industry to a newer heights. From concrete to steel, the industry has evolved in a major way and the reasons that act as the catalyst in the remarkable growth of the industry are the enormous advantages associated with pre engineered buildings. Some […]

INTRODUCTION Richa Industries designed, fabricated, supplied & erected one of the tallest multi-storey steel structures buildings in India located in Haridwar, Uttarakhand. The 47 meter high steel building has G+9 floors. The area of the building is approximately 2025 square meters. The clear height is 34 meters and the high bay height of the building is 47 meters. The building is the Fatty Acids manufacturing unit of Wipro Enterprises. OVERVIEW OF THE PROJECT The project has been designed according to the latest design code IS-800-2007 (Limit State Method). For such structures with high design complexity, it is required to integrate the structure into a whole physical system. The Bentley’s STAAD.Pro V8i […]